What are the major differences between the two forms (at least 5 differences with detailed explanation on how they would impact the contracting parties liabilities and responsibilities)?
Compare the AGC Document No. 200 Standard Form of Agreement and General Conditions Between Owner and Contractor (AGC_200.pdf Preview the document ) and AGC Document No. 415 Standard Form of Design-Build Agreement and General Conditions Between Owner and Design-Builder (Lump Sum) (AGC_415.pdf Preview the document ) This assignment is divided into 2 parts: Part 1: Compare the AGC Document No. 200 Standard Form of Agreement and General Conditions Between Owner and Contractor (AGC_200.pdf Preview the document ) and AGC Document No. 415 Standard Form of Design-Build Agreement and General Conditions Between Owner and Design-Builder (Lump Sum) (AGC_415.pdf Preview the document ). What are the major differences between the two forms (at least 5 differences with detailed explanation on how they would impact the contracting parties liabilities and responsibilities)? Be specific by numbering each difference and referencing the contract clause no. pertinent to both contract types. Part 2: Peer-review 2 of your colleagues work and provide comments “ due date one week from submission date (5 points). You are expected to provide constructive comments tackling 2 main aspects: What is one thing you learnt from reading your peer’s submittal OR one thing you always do that he/she did that strengthens his/her submittal? What is one thing that you would advice him/her to do to strengthen his/her submission? Case Study Analysis Rubric Criteria Ratings Pts Completeness Complete in all respects; reflects all requirements 5 pts Complete in most respects; reflects most requirements 3.5 pts Incomplete in many respects; reflects few requirements 2.5 pts Incomplete in most respects; does not reflect requirements 5 pts Understanding Demonstrates a sophisticated understanding of the topic(s) and issue(s) 5 pts Demonstrates an accomplished understanding of the topic(s) and issue(s) 3.5 pts Demonstrates an acceptable understanding of the topic(s) and issue(s) 2.5 pts Demonstrates an inadequate understanding of the topic(s) and issue(s) 5 pts Evaluation and recommendations Supports opinions with strong arguments and evidence (contract terms); presents a balanced and critical view; interpretation is both reasonable and objective 5 pts Supports opinions with reasons and evidence (contract terms); presents a fairly balanced view; interpretation is both reasonable and objective 3.5 pts Supports opinions with limited reasons and evidence; presents a somewhat one sided argument 2.5 pts Supports opinions with few reasons and little evidence; argument is onesided and not objective 5 pts Description of criterion Presents an insightful and thorough analysis of all issues identified 5 pts Presents a thorough analysis of most issues identified 3.5 pts Presents a superficial analysis of some of the issues identified
PLACE THIS ORDER OR A SIMILAR ORDER WITH BEST NURSING TUTORS TODAY AND GET AN AMAZING DISCOUNT
The post What are the major differences between the two forms (at least 5 differences with detailed explanation on how they would impact the contracting parties liabilities and responsibilities)? appeared first on BEST NURSING TUTORS .